Description
Bollard Pull: 70 tons
Starboard engine overhauled in Nov. 2019
Center engine – new Jan. 2020
Port engine – new April 2015
Tow Winch Double Drum Markey TDS-36 Lower drum 2200′ 2.25″
Almon Johnson upper drum 1850′ 2.25″ – Installed 2022
Crane: 3 ton HIAB marine crane
Tugger Air: 1 ton tugger to move rigging in place
Towing Gear: Bridles chain and wire/surge chain/portable running lights
Pushing Gear: Pushing gear for canal transits/harbor entrances
Hull: heavy reinforced 1/2″ plate/keel plate 1.50″ plate with 17 integral tanks, heavy rubber fendering
Anchors: 2 @ 7000 pounds each in recessed pockets able to anchor tug and tow/ bow windlass with capstans
Range: 30 days towing/60 days utility work